<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Projects Executed
            Photo Gallery
            St. Raphael Hotel, Limassol
            Client:
            Alltime Tourist Complex
            Architect:
            Colakkides & Pavlides
            Commencement Date: 1986
            Completion Date: 1988
            Details
            The St. Raphael Hotel  (formerly SHERATON Hotel) is a 5 star hotel in Limassol, constructed by GCC in 1986 for Alltime Tourist Complex.  The Conference Hall of the Hotel was also constructed by GCC in 1993.
            Back to Projects Executed
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio