<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Projects Executed
            UCLAN, Cyprus
            Client:
            F. G. Lancashire Premises Ltd.
            Architect:
            George Lissiotis
            Duration: 20 months
            Commencement Date: January 2012
            Completion Date: September 2013
            Details

            The University of Central Lancashire in Pyla, Cyprus.  Phase 2

            Construction of a building complex of reinforced concrete (and steel structures for the Auditorium and Spotrs Centre) and external works.

            Phase 1 of the Contract was completed by GCC Ltd. in September 2012.

             

            Back to Projects Executed
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio