<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Toyota Olaya Home, Olaya, Riyadh
            Messrs. Abdullatif Jameel Co.

            Construction of new Car Showroom and Workshop, including basement, ground floor Showroom and Workshop, first floor workshop and offices and second floor accommodation.

            Total area 16,086 sq.m.

            Completion Date: 31/3/2012
            Al-Jomaih Green Field Facility
            Al-Jomaih Automatic Company
            Construction of Al-Jomaih Car Showroom, Green Field Facility Building in Badiya, Riyadh, consisting of Basement, Ground Floor and 1st Floor (total 6715 sq.m.)
            Completion Date: 30/06/2011
            Al-Jomaih - Renovation of Showroom, Kurais Road, Riyadh
            Al-Jomaih Automatic Company

            Renovation of existing Car Showroom

            Total area 1865sq.m

            Completion Date: 31/08/2011
            Toyota Showroom, Jarokum, Kilo-7, Jeddah
            Messrs. Abdullatif Jameel Co.

            Renovationof Car Showroom and 1st floor offices - total area 910 sq.m.

            Completion Date: 31/03/11
            Al-Inma Bank, Al-Aziziah Branch, Riyadh
            Al-Inma Bank
            Construction of the Al-Aziziah Brnach for the Al-Inma Bank in Riyadh, comprising of Ground Floor and 1st Floor - total 1,300 sq.m.
            Completion Date: 28/02/2011
            Al-Inma Bank, Salman AL-Farsi Branch, Riyadh
            Al-Inma Bank

            Bank Premises in Salman Al-Farsi, Riyadh, comprisng of Groud Floor and First Floor (total 1,300 sq.m.)

            Completion Date: 28/02/2011
            Golden Chip Factory
            Golden Chip Company
            The Project consists of the construction of a Factory Building  in the Industrial Area of Dammam, comprising of Ground Floor (2,2770 sq.m.) and First Floor (275 sq.m.)
            Completion Date: 20/03/2011
            Abdullah Hashim Office Building (Honda)
            Messrs. Abdullah Hashim
            Construction of the Administration Building for HONDA dealers, comprising of Ground Floor (900 sq.m.) and First Floor (900 sq.m.)
            Completion Date: 31/03/2011
            El-Khereij Warehouse, Al Faisalya, Dammam
            El-Khereiji Construction Co. Ltd.
            Constructionof a new Warehouse Building - total area 13,710 sq.m.
            Completion Date: 30/06/2010
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio