<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Projects Executed
            Elea Golf Club House
            Client:
            S.Z. Eliades Leisure Ltd.
            Architect:
            Costas Meletiou Consultants
            Duration: 12 months
            Commencement Date: May 2009
            Completion Date: May 2010
            Details
            The project consists of the construction of an in-situ reinforced concrete building, consisting of three main levels (Cart Barn Level, Lower Ground Level, Plaza Level). The project includes all the external works such as footpaths and landscaping with rocks, etc.
            Back to Projects Executed
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio