<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Projects Executed
            Please click on the link  for the Projects executed  by GCC in the recent years 
            Limassol Port Grain Silos
            Cyprus Grain Commission
            Concrete Silos with all the Ancillary external works
            Completion Date: 1981
            Poseidonia Beach Hotel
            Chartered House Estates Ltd.
            A Five Star Hotel in Limassol, constructed by GCC in 1979, with swimming pool, marine works etc
            Completion Date: 1977
            Paphos Main Canal
            Water Development Department
            Concrete line Irrigation Canal including pipework
            Completion Date: 1979
            Makarios Athletic Stadium, Nicosia
            Cyprus Sports Organisation (KOA)
            The Makarios Athletic Stadium in Nicosia...
            Completion Date: 1979
            Old Projects
            Amongst the older prestigous Projects of GCC are the Ledra Palace Hotel, The Nicosia International Airport, The Nicosia Municipality Theatre, Apollonia Beach Hotel in Limassol...
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio