<address id="nb9l9"><dfn id="nb9l9"><thead id="nb9l9"></thead></dfn></address>

          <track id="nb9l9"></track>
          <big id="nb9l9"><span id="nb9l9"></span></big>
          
          

            print this page email this page go to the top of the page
            Home
            Contact Us
            Sitemap
            Projects Executed
            Elea Golf Infrastructure Project
            Client:
            S.Z. Eliades Leisure Ltd.
            Architect:
            N.C. Meletiou Architects and Engineers
            Duration: 12 months
            Commencement Date: 2009
            Completion Date: 2010
            Details
            Construction of approximately 1,750m road (including a 7m width of asphalt pavement and a 2m footpath on one side), sewerage and storm water drainage, 6 No substations for the Electricity Authority of Cyprus, as well as the construction of a public road.  
            Back to Projects Executed
            © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio